Case Studies
-

Hastings Hotels
NORTHERN IRELAND WIDE
2011 - present
Installation, maintenance and metering bureau services for the entire Hastings group. -

Belfast HSC Trust
BELFAST
2011 – present
Installation and maintenance of BMS services and complete building analytics fault detection and optimisation services. -

Finnebrogue
DOWNPATRICK
2025 - present
Complete Retrofit of existing BMS controls and new Entelliweb dashboard specific to customer needs to all factories. -

The Arches Project
BELFAST
2025 - present
The Arches project involved the upgrade and integration of a modern DALI-2 lighting control system to enhance functionality, flexibility, and overall system visibility. The outcome is an intuitive and efficient control environment, improving operational oversight while supporting energy efficiency and long-term system performance. Click here to watch the project video. -

Central & North West LondonHSC Trust
LONDON
2026 - present
BAC proudly supported Central and North West London Southern HSC Trust by supplying BMS and wireless metering technologies to help deliver their public sector decarbonation scheme commitments and will work collectively to optimise building management straggles and technologies moving forward. -

NIFRS (LDC Desertcrete)
BELFAST
2024 – present
New installation and maintenance of Europe’s leading emergency services learning and development training centre. -

Pilgrims (Moy Park)
NORTHERN IRELAND
2005 - present
providing BMS and environmental metering and control since 2005. -

Kingsbirdge Hospital Group
NORTHERN IRELAND
2024 – present
Retrofit of existing controls across the group onto an Entelicloud platform capable of remote bureau series and real-time optimisation. -

Orchardville House, Belfast HSC
BELFAST
2025 - present
BAC delivered a Kaizen-driven optimisation of the Orchardville building by enhancing the existing Delta Controls BACnet BMS with CopperTree Analytics Kaizen analytics and wireless LoRaWAN space temperature sensors. The result was improved heating efficiency, reduced boiler runtime, enhanced occupant comfort, and improved operational visibility. -

Choice Housing
NORTHERN IRELAND WIDE
2017 – present
Installation and servicing of BMS with bureau services across the group helping to optimise built environment and fix faults before they impact clients. -

Belfast International Airport
COUNTY ANTRIM
2011 – present
BMS and metering infrastructure across the entire site. -

Regional Victoria Pharmaceuticals Building
BELFAST
2025 – present
Complete retrofit of existing lighting and emergency lighting to smart wireless controls with tri-sensors interfaced through BMS to realise significant lighting and heating costs and improved compliance and environmental conditions.